DUMC SETI progress report Updated 07/21/03 16:35:01 EDT job done change ETA a1 33.22% 0.00% 7.6 h a2 60.80% 0.00% 4.9 h b1 78.71% 5.41% 3.9 h b2 77.90% 5.39% 4.0 h bo 18.65% 0.00% 9.5 h d1 90.74% 0.00% 1.1 h d2 65.59% 0.00% 3.2 h h1 15.09% 0.00% 12.8 h n1 43.50% 0.00% 3.0 h r2 59.76% 0.00% 6.8 h s1 73.49% 0.00% 3.3 h s2 62.03% 0.00% 4.7 h s3 66.78% 0.00% 4.1 h s4 84.89% 0.00% 1.8 h t1 11.34% 0.00% 3.5 h t2 18.39% 0.00% 3.3 h The 1st column shows the code for each job, such as "b1" for the process running on the 1st CPU of bishop.mc.duke.edu, a 2-processor machine. The 2nd column shows the percentage done for the current data unit. The 3rd column shows the change in work done since 15 minutes ago. The 4th column shows the estimate time of accomplishing that unit in hours.